Specifications include, but are not limited to: The proposed improvements will consist of widening approximately 1096 lineal feet of nine (9”) inch Portland Cement Concrete (PCC) pavement on a drainable subbase with subdrains from the existing 2 lane corridor to 4 lanes with turn lanes on Devils Glen Road from Forest Grove Drive to Crow Lake Drive. There will also be a five (5’) foot wide sidewalk added on the west side of Devils Glen Road for the pedestrian connection between Forest Grove Drive and Crow Lake Drive. Also included with this project is storm sewer intake reconstruction, storm sewer intake adjustments, manhole adjustments, pavement striping, sodding, erosion control, traffic control, and other work related to reconstructing this street.