Design and construction of new ADA accessible parking spaces, curb ramps, and signage located at intersections of 3rd St SE and 6th Ave SE and 3rd St SE and 7th Ave SE. The Engineer’s opinion of probable cost is $81,000. 1 2010-C CLEARING AND GRUBBING 1 LS 2 2010-J SUBBASE 103.8 TON 3 5920-H VALVE BOX ADJUSTMENT 2 EA 4 5920-L RELOCATION OF EXISTING FIRE HYDRANT 1 EA 5 7010-E CURB AND GUTTER, PCC 274 LF 6 7010-F BARRIER CURB, PCC 138.7 LF 7 7030-A-1 REMOVAL OF SIDEWALK 47.8 SY 8 7030-A-3 REMOVAL OF DRIVEWAY 36.1 SY 9 7030-B REMOVAL OF CURB 224.7 LF 10 7030-E SIDEWALK, PCC, 6" 99 SY 11 7030-G DETECTABLE WARNING 61 SF 12 7040-A FULL DEPTH PATCHES 90.3 SY 13 7040-H PAVEMENT REMOVAL 6.8 SY 14 8030-A TEMPORARY TRAFFIC CONTROL 1 LS 15 8920-A SIGNS PANELS 14 SF 16 8920-B SIGN POSTS 77 LF 17 8920-D REMOVE AND REINSTALL SIGN PER PLAN 2 EA 18 8920-E REMOVAL OF SIGN 7 EA 19 9020-A SOD 1 LS 20 11,010-A CONSTRUCTION SURVEY 1 LS 21 11,020-A MOBILIZATION 1 LS