Contractor shall remove and properly dispose of the existing gutter, downspouts and metal drip edge. 2.2 Contractor shall remove and properly dispose of the existing EPDM membrane and ½” wood fiber cover board. The existing built-up roof system shall remain in place. The existing built-up roof system contains asbestos. Contractor shall refer to the attachment section for report. 2.3 Contractor shall inspect the condition of the built-up roof system. Any wet, damaged, or unsuitable builtup roofing shall be removed by an asbestos abatement contractor and shall be coordinated with the Project Manager for a contract amendment before any work is completed. 2.4 Any damaged, unsuitable, or wet tectum roof decking shall be replaced. Work shall be coordinated with the Project Manager before any work is completed. 2.5 Contractor shall repair the damaged roof deck on the southwest corner of the “tower”. 2.6 Contractor shall furnish and install new wood nailers around the perimeter and roof top penetrations as needed to receive the new roof insulation. 2.7 Contractor shall furnish and mechanically attach two (2) layers of 2” ISO insulation. Insulation fastening pattern shall be as required for warranty. 2.8 Contractor shall furnish and adhere one (1) layer of .060 EPDM membrane over the new roof insulation per roofing manufacturer warranty specifications.