Specifications include, but are not limited to: Construction Manager (McGough Construction) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of HVAC upgrades for Phase 1 only as specified in the Hope-Stratton HVAC Evaluation report to improve humidity issues within the facility. DAS may negotiate with the design firm selected through this process to provide additional future design services for Phase 2 and any other HVAC-related recommendations that may develop. Design services shall include: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 Design for the follow scope of work: 1.3.5.1 Phase 1 HVAC Upgrades as noted in the Hope-Stratton HVAC Evaluation report. Designer to review and confirm all recommendations for equipment sizing, controls and ventilation levels. 1.3.6 Existing PDF drawings will be provided to the successful design firm. Accuracy of drawings shall be verified by the design firm. 1.3.7 Field examination of the existing buildings. 1.3.8 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include nonproprietary equipment and systems. 1.3.9 Provide minor drawing work to assist the Construction Manager in the development of hazardous materials bid package. This shall include providing PDF backgrounds for identification, by others, of hazardous materials removal. 1.3.10 Designer shall include any and all survey work required for completion of project. 1.3.11 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required. 1.3.12 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule. 1.3.13 Designer shall assist Construction Manager in the evaluation of long lead times. 1.3.14 Quality control during Design, Preconstruction and Construction. 1.3.15 Compliance with all Federal, State, and applicable AHJ codes. 1.3.16 Completion of State building and energy code documents, as required...