Specifications include, but are not limited to: Contractor shall be responsible for the design, optimization, specify and furnish the equipment and materials which shall include, but not be limited to, PV modules, inverters, racking, inverter DC wiring harnesses, combiner boxes, and ancillary hardware required to connect and operate listed equipment in a safe, efficient manner. Contractor shall be responsible for project design engineering and drawing packages for permitting, interconnection agreements, installation and “as-built” documentation. Drawings and calculations may be required to be PE stamped once in final form. Contractor shall design and install entire system in accordance with all applicable federal, state, and local ordinances and standards. Contractor shall be responsible for obtaining, and providing to owner, all permits necessary to support construction and project installation...