Specifications include, but are not limited to: 942 Southern: Deconstruct framing in basement for abandoned bathroom. Leave salvaged wood in basement for future use. Inspect chimney for blockages, deteriorated lining, or other issues that would lead to back-drafting. Clear obstructions, if present. Repair as required. Replace fourteen (14) windows with vinyl pocket replacement windows as identified on enclosed floor plan. It is the contractor's responsibility to ensure all windows meet code requirements prior to ordering, and that all finish carpentry is completed in a workmanlike manner as part of this scope. Replace roof with asphalt shingles. Secure any areas of loose soffit and fascia. Secure all HVAC ducts in the basement. Remove and replace all ducting material that is not code-compliant. Tape all connections with approved adhesive. Install mini-split in second-floor bedroom. Remove toilet and cap pipe. Leave toilet in basement for future use. Replace water heater with energy efficient water heater that is minimally the same capacity as current water heater. Replace loose receptacles throughout the structure Restore power to receptacle near front door. Add GFCI protection to disposal receptacle. Repair closet light in 1st floor bedroom. Restore power to bathroom receptacle - secure box Replace water heater with an equivalent size and fuel. Add GFCI protection or equipment ground to receptacle in bedroom 2 Add cover plates to receptacles and switches in bedroom 3. Investigate nuisace trips with the air conditioner Correct cable support issues in basement, Add GFCI protection or equipment ground to receptacle in 4 seasons room Secure conduit at service panel.