Specifications include, but are not limited to: Clearing and grubbing, topsoil stripping, stockpiling and placing, excavation, modified subbase, compaction, pipe culverts and aprons, removal of pavement, 6” PCC shared-use path, 5” HMA shareduse path, special subgrade preparation, detectable warnings, 6” PCC driveway, full depth patching, pole foundations, painted pavement markings, traffic control, traffic signs, perforated steel posts and anchors, removal and reinstallation of signs, seeding, mulching, and fertilizing native grass and forbs and type 2 seeding, SWPPP preparation and management, erosion control items, class 10, 20 and 22 excavation, granular backfill, structural concrete, reinforcing steel, stainless steel reinforcing steel, pre-engineered steel truss trail bridge, erosion stone, engineering fabric, revetment, lighting, and other incidental items to complete the project. The Project includes an alternate bid for improvements to a Prestressed Pretensioned Concrete Beam Bridge on N. Illinois Avenue and the extent of the work involved is the furnishing of labor and new materials for the construction of widening the sidewalk that traverses the bridge, but not limited to the following: Furnishing and spreading topsoil, concrete separation barrier rail and footing, removal of pavement, removal of sidewalk, concrete approach barrier, 6” PCC sidewalk, mulching, seeding and fertilizing and erosion control items, and other incidental items to complete the project.