Specifications include, but are not limited to: This work includes the rehabilitation of the two parking lots only at Palmer Hills Golf Course. The proposed improvements consist of excavation, installing granular subbase, rotomilling, Hot Mix Asphalt (HMA) pavement, curb and gutter, sidewalks, and other related work within the City of Bettendorf, Iowa. - The Contractor shall perform everything required to be performed and shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to perform and complete in a workmanlike manner all the work required in connection with the construction of the Palmer Hills Golf Course Parking Lot Resurfacing Project - 2024., all in strict accordance with the plans and specifications, including any and all addenda prepared by Engineering Division of the Public Works Department of the City of Bettendorf, Iowa, which plans and specifications are made a part of this contract; and in strict compliance with the Contractor's proposal and the other contract documents herein mentioned which