The DNR Seeks to Purchase: Engineering services from a qualified engineering consulting firm for a design and construction package to remove and replace sixteen fish-rearing pond liners, replace existing steps leading into the ponds, repair cracked/deteriorated concrete catch basins and water control structures, replace the 6” butterfly valve at each of the sixteen ponds, repair or replace the sluice gate at each of the sixteen ponds, replace the 8” butterfly system drain valve and operator, furnish and install ten 5HP floating aerators (complete with timers), and repair all damage associated with construction. In order to limit disturbances to hatchery operations, construction work needs to occur between July 1, 2025 and November 30, 2025.