Specifications include, but are not limited to: Task 1: Kickoff Meeting Description: The Service Provider shall meet on-site with the DNR to establish goals, objectives, and standards, including but not limited to expectations, regulatory requirements, timelines, and communication protocols. Task 2: Prepare Facility Plans Description: The Service Provider shall review current loading and infrastructure, request the Waste Load Allocation, analyze Antideg Alternative (if required), and prepare and submit the Facility Plans. Task 3: Final Design Description: Develop the final design based on the approved Facility Plan. This includes all necessary field work that may include topographic survey and geotechnical survey. Description: Develop the final design based on the approved Facility Plan. This includes all necessary field work that may include topographic survey and geotechnical survey. Task 4: Archaeological Survey Description: Develop the necessary archaeological survey reports to clear the construction footprint and coordinate with the State Historic Preservation Office for concurrence. Task 5: Permits Description: Obtain construction permits as necessary, including but not limited to clearances required by IDNR Sovereign Lands construction permits, IDNR Flood Plain Development permits, US Army Corps 404 permits, IDNR wastewater construction permits, sludge disposal (land application) permits...