Specifications include, but are not limited to: 1 Group 1 - Base Bid 1. Review data, coordinate schedule, mobilization 14.00 EA 2 2. Pull existing M well pump & column piping 3.00 EA 3 3. Inspect pump – Condition Report 3.00 EA 4 4. Pull existing MR/RR well pump & Boreline 9.00 EA 5 5. Inspect sub. pump Rpt/ Clean Boreline 9.00 EA 6 6. Pull existing S well pump and column piping 2.00 EA 7 7. Inspect pump – Condition Report (M and S Wells) 5.00 EA 8 8. Video – pre-rehab 14.00 EA 9 9. Pump Test – pre-rehab 14.00 EA 10 10. Mechanical Cleaning (brushing, surging, bailing – minimum 4 hours): 14.00 EA 11 11. Sonar Jetting 14.00 EA 12 12. Bore Blast 14.00 EA 13 13. Acid Treatment A (refer to Exhibit A in specs) 4.00 EA 14 14. Acid Treatment B (refer to Exhibit A in specs) 6.00 EA 15 15. Acid Treatment C (refer to Exhibit A in specs) 4.00 EA 16 16. Sodium Hexametaphosphate (Phosphate) Treatment (refer to Exhibit A in specs) 9.00 EA 17 17. Chlorination with NW-410 enhancer (refer to Exhibit A in specs) 14.00 EA 18 18. Pump Test – post rehab 14.00 EA 19 19. Re-install M Well Pump 3.00 EA 20 20. Re-install MR/RR Well Pump 9.00 EA 21 21. Re-install S Well Pump 2.00 EA