Specifications include, but are not limited to: 1. The successful bidder will deliver to the Brewer Public Works Department approximately 2,000 cubic yards of screened sand per year. 2. Delivery shall occur during regular work hours of the Department of Public Works, 7:15 a.m. to 3:15 p.m. Monday - Friday. The Contractor will be notified by the Director or Public Works 7 days prior to the required date of delivery so that the City may provide an inspector on the site during the delivery period and coordinate the delivery of salt for mixing. All trucks will be measured and each load shall be verified received by the City Inspector. 3. Screened material must meet the following gradation: Sieve Size Percent Passing 3/8" 100 1/4" 95 - 100 #10 55 - 95 #40 10 - 60 #200 0 - 5 4. Unless otherwise mutually agreed upon all material shall be delivered to Brewer Public Works by October 25th of each contract year. 5. Each year the successful bidder, at their cost, shall provide to the City of Brewer recent test results showing the proposed material will meet the required gradations, one (1) week prior to the first scheduled delivery of sand. The gradation test must be done by a qualified soils testing facility; the name of the facility, the technicians name, material type and material location from which the sample was taken shall be included in the report from the selected testing facility.