Install flashing around existing chimney (needs mechanical termination, water block or counterflashing on the chimney) Correct all flashing that contacts masonry (plywood should be anchored to the masonry with a chamfered top edge to provide substrate, mechanical terminated membrane on the vertical and horizontal edges.) Correct areas where wall flashing on roof is too low (presently there are no mechanical termination, plywood, water block, base tie-ins) Correct improper flashing terminations where necessary (very low flashing height on south face of metal panel wall, membrane should be behind metal flashing, cut up a minimum of 8” with a wood substrate terminated and counter flashed) Correct areas where a 3” drip edge was used without a cleat making it non-compliant to ES-1 Standard of International Building Code. Provide and secure clamp rings on all vent pipes. Make sure all roofing membrane is terminated and flashed to existing buildings to meet International Building Code (were narrow roof on north side meets adjoining building intersection, membrane is not terminated) Install perimeter fastening enhancements (there are none evident) West end of roof fascia trim is outboard of drip edge and needs to be installed inboard Disposal of all debris can be placed in our roll-off on sight