The purpose of the amendment is to include RFI Question and Answers and post the site visit sign in sheet. 1. The plans call for the contractor or the owner to have a Physicist survey done. Can you get us a copy of that report. Answer: Please see attached Bangor 3D Shielding Plan.pdf , Drawing.pdf 2. Can we get current building drawings for Architectural, structural, and electrical. This is needed to price out the Unistrut for the gantry installation and electrical runs. Answer: Please see attached Bangor Arch.pdf , Bangor Struct.pdf , Bangor -Elec.zip 3. IN Imaging Suite 1709 can you provide scope of work and product specs for flooring and ACT. Answer: Contractor will have to level floor and re-apply flooring material to match existing for DVS and MS equipment if leveling tolerances on sheet S1 are not met where DVS and MS equipment is to be installed. Modifications to existing ceiling ACT may be required.