Specifications include, but are not limited to: the exploration of subsurface conditions at various locations throughout the State of Maryland and for providing Drilling Equipment, Certified Drillers, Driller Helpers, and Technician Support. All work, as to be shown on specific project plans, shall be performed by means of earth borings with augers, split barrel soil samples, core borings, in-situ testing, laboratory testing and other work as may be required. The work to be performed by the Contractor consists of the furnishing of all materials, labor, tools, machinery and other equipment, vehicular transportation, and all incidentals necessary and proper for the expeditious completion of these subsurface investigations; all in accordance with these specifications and the Maryland Department Of Transportation/State Highway Administration Specifications entitled "Standard Specifications for Construction & Materials" dated July 2022 and project plans, which will be provided to the Contractor.