1. Contractor to remove the existing asphalt and concrete at the dumpster location. 2. The area to be removed and replaced is outlined with blue paint. Area is approximately 21x100. Contractor shall field verify. 3. Contractor shall also demo and replace the existing approach, also outlined in blue. 8 inches of concrete is required. 4. Contractor shall repair the base and compact 5. A minimum of 10 gage 6x6 wire mesh shall be used in both areas. 6. A minimum 6 inch depth and 8 inches for the approch of 4500-psi concrete shall be installed. 7. Where new concrete meets existing concrete, contractor shall pin together. 8. Contractor shall repair any damage to the lawn, and to seed any backfilled areas. 9. Contractor shall be insured and provide copy of liability insurance and workers’ comp. 10. Contractor is to provide all necessary materials, and equipment. 11. Contractor is to provide barricades to project and public. 12. Contractor is to provide only qualified personnel to complete the project. 13. Contractor is responsible for daily cleaning of the job site.