• Contacting Miss Dig and ensuring wrecking clearances have been obtained. • Submitting abatement and demolition notices pursuant to state requirements. • Securing appropriate permits and inspections. • Cutting and capping water and sewer lines. • Asbestos abatement and universal waste removal and disposal. • Demolishing all structures. • Removing asphalt, concrete foundations, building footings, driveways, and surface and buried (if found) debris. The pole barn and asphalt parking lot at the Pearl St. property must be preserved. • Taking open hole photos of cut and capped utilities and the open excavation showing all foundations have been removed. Marking the location of any capped utilities with a labeled wooden stake after backfill. • Backfilling excavations with clean compacted suitable fill material and finishing with topsoil and grading, as described in section 5.5. • Seeding and erosion control.