1 SP-01 CONTRACTOR QUALITY CONTROL PLAN (CQCP) LSUM 1 2 SP-02 REIMBURSED UTILITY MODIFICATIONS ALLOW 20,000.00 $ 1 20,000.00 $ 3 110-1 MOBILIZATION, MAX (10%) LSUM 1 4 204-1 CURB AND GUTTER, REM LFT 110 5 204-2 PAVT, REM SYD 25 6 204-3 SIDEWALK, REM SFT 250 7 204-4 FENCE, REM LFT 55 8 205-1 SUBGRADE UNDERCUTTING, TYPE IV CYD 50 9 208-1 EROSION CONTROL, SILT FENCE LFT 55 10 208-2 EROSION CONTROL, INLET PROTECTION, FABRIC DROP EACH 8 11 308-1 GEOTEXTILE, SEPARATOR, NON-WOVEN SYD 140 12 801-1 DRIVEWAY, REINF. CONC., 6-INCH, INCLUDING AGGREGATE BASE SYD 110 13 802-1 CURB AND GUTTER, CONC., INTEGRAL, DET F4, INCLUDING AGGREGATE BASE LFT 100 14 810-1 POST-MOUNTED ROAD SIGN, TYPE IIIA, 24-INCH X 24-INCH, INCLUDING SUPPORTS EACH 1 15 811-1 PAVT MRKG, REM. SFT 750 16 812-1 PROJECT SAFETY & MAINTENANCE OF TRAFFIC LSUM 1 17 816-1 MISC. HYDROSEED, MIXTURE TURF WITH FERTILIZER, WOOD FIBER MULCH, TOPSOIL ACRE 0.25 18 824-1 CONTRACTOR SURVEY AND STAKEOUT LSUM 1