a. Security: Provide site security for duration of project after notice to proceed is received. b. Mobilization: Includes all labor, equipment, materials, and incidentals to mobilize to the project site to perform the work. It includes all supervision of successful Respondent(s) personnel, and office support. It includes project meetings, surveying, site security, temporary controls and utilities, pre-work submittals, preparation of all submittals including, the successful Respondent(s)’s Site Specific Work Plan and Health and Safety Plan (HASP), personal protective equipment, permits, disposal approvals, erosion controls, barricades, traffic control, trash disposal, cleaning, and demobilization. Total cost of this item shall not exceed four (4%) percent of the successful Respondent(s)’s overall base bid. c. Utilities: The SLBA has not requested disconnection of gas, electric or any other utility service from these sites. The successful Respondent(s) will be responsible for confirming the status of all utilities and to have all utilities cut and removed from the site as required by regulation, local ordinance or, at a minimum, generally accepted methods. This may include well capping and proper closure of any onsite sewer systems or drainage systems as detailed in Phase I/II reports, or as found by successful Respondent(s). The successful Respondent is responsible for contacting Miss Dig prior to any demolition activity. d. Asbestos Containing Materials: Includes all labor, equipment, materials, incidentals, transportation, and disposal fees for the pre-demolition abatement of asbestos containing materials. Successful Respondent(s) to submit Notification of Intent to Renovate/Demolish to EGLE and the MIOSHA Asbestos Program at the Michigan Department of Licensing and Regulatory Affairs (“LARA”), provide the SLBA with copy of notification and any subsequent revisions to notification.