REPLACE UP TO 100% OF ROOF DECKING (Specification ID:35.06000 Estimated Qty:) EA If required, replace up to 100% of any rotten, badly warped or broken roof decking and nailers. Must use new 7/16" OSB sheathing and H-Clips. Before and After Photos are REQUIRED to document need for replacement and the work completed. TEAR OFF AND INSTALL NEW DIMENSIONAL SHINGLES **PERMIT REQUIRED** (Specification ID:35.10150 Estimated Qty:26) 26 Sq Remove existing roofing and pile neatly. Install new synthetic underlayment and 30 yr LAMINATED DIMENSIONAL SHINGLES. Install 2" drip edge on all edges. Install new flashing to wall junctures. Flash chimney and wall junctures with 28 gauge steel or .019 aluminum. Install flashing in step fashion with minimum of 3" headlap. Secure to masonry by raking out the mortar joint to a depth of 1 1/2". Fill the joint with Portland Cement. Install vent stack boots. Install exhaust vents to code. Valleys shall be closed cut. Color to be chosen by homeowner. Remove all roofing debris from site. *****Install Ice and Watershield 4' INSIDE THE EXTERIOR WALL LINE and Install continuous metal ridge vent along ridge lines of roof per MRC code R905.2.7.1***** ****Contractor to take pictures before, during, and after construction. Showing all non-visible aspects of the roof from the ground, including roof decking after being stripped. Show new roof decking & any damaged areas that were repaired****