Taxiway A Reconstruction – Phase 5 - 34,000 SY 13-inch P-501 PCC, 3,000 SY 12-inch P-501 PCC, 4,500 tons bituminous pavement (State Spec., P-401 and P-403 mixes), 60,000 CY excavation, 11,000 CY P-209 crushed aggregate base, 26,000 CY P-154 granular borrow, pavement marking, turf restoration, conduit, airfield lighting and signage, 3,500 LF storm sewer with storm structures, and 7,500 LF drain tile. De-icing Pad - Construction of a concrete pad to support a 3,000-gallon tank for de-icing fluid. Project also includes minor grading and drainage improvements. Midfield Ramp Repairs – Phase 2 - Removal of 2,600 SY existing PCC airfield pavement, 1,800 CY excavation, placement of 1,500 CY crushed concrete base, installation of 3,000 SY 12-inch P-501 PCC pavement, and installation of 700 LF 6” diameter draintile . Project work also includes miscellaneous removals, pavement markings, turf establishment, and erosion control measures.