1. Installation of a 600 gpm fiberglass induced draft aerator and steel support system on existing concrete clearwell, 2. Cleaning and lining of existing concrete ground clearwell, 3. Installation of two 600 gpm vertical turbine service pumps on existing concrete clearwell, 4. Installation of powder lime feed system including fiberglass building, 5. Installation of chlorine feed system including fiberglass building and concrete slab, 6. Installation of phosphate feed system including fiberglass building and concrete slab, 7. Installation of yard piping, 8. Installation of new electrical system, 9. Upgrade of existing SCADA system components, 10. Tree removal from site perimeter, and 11. Installation of new 6’ chain link perimeter fence.