The vendor Shall supply the following: 1. The entire roof area will be power washed and allowed to dry. 2. Re-caulk all existing counterflashing and termination bars, any loose fasteners shall be removed and replaced. 3. All existing EPDM seams and flashings shall be (3) three courses flashed with polyester mesh and silicone coating. 4. Contractor shall apply a suitable primer over the entire roof for promoting proper adhesion of silicone coating to the EPDM roof. 5. The vendor shall supply a base coat of Neogard Silicone coating, or equivalent, at a rate of one gallon per 100 square feet. 6. After curing, a topcoat of silicone coating shall be applied at the rate of one gallon per 100 square feet. 7. Contractor shall install three-foot-wide walkways from a third layer of silicone coating and ceramic granules. Granules installed at a rate of 40 lbs. per 100 square feet to create granulated walkways to and around rooftop equipment. Specific location to be determined by building owner. 8. Base and topcoat should yield 16 mil, dry. 9. A 5-year leak free guarantee must be issued by contractor and a 10-year guarantee to be issued by manufacture. 10.All waste materials must be removed and disposed of properly. 11.Contractor to furnish ALL labor, supervision, materials, equipment, roll-off dumpsters, workmen’s compensation, liability, and property damage insurance to complete work in a professional workman like manner