Remove all existing coping cap, dented counter flashing and expansion joint cover. Furnish & install new sheet metal components fabricated from 24-gauge Kynar coated steel. Color to match existing. ES-1 rated coping cap as specified at perimeters. No shop fabricated coping or fascia. Furnish & install one (1) new polycarbonate skylight dome. Approximate size 4’x4’. The skylight is located on roof unit I as indicated in CSRC Drawing date 9/25/2024. Vellux CS2 is the basis of design. Furnish & install one new HVAC pad. Pad is in roof section AF as indicated in CSRC Drawing dated 9/25/2024. Remove & replace two metal panel roofs, approximately 650 square feet. (Areas I & N) Match existing panel profile. Furnish & install one new stack flashing on area I. Replace one exhaust fan. Located in roof area S, on CSRC Drawing dated 9/25/24. Furnish a two-year workmanship warranty. Arrange for manufacturer’s reinspection(s) to maintain warranty coverage.