-Install perimeter nailer boards to meet the height of and for the perimeter attachment of the new roof. -Install new flute filler insulation between all ribs of the existing meal roof. -Install a 1/2" coverboard with fasteners over the flute filler layer. -Install new with 60 mil TPO membrane over insulation, mechanically fastened, and all seams heat welded per manufacturer specifications. -The perimeter of roof system will be secured with a termination bar into existing gutters and over fascia -Install new TPO vent flashings and heat weld to TPO membrane -Provide warranty on materials and workmanship -Final clean up of job site and removal and disposal of all debris - Any necessary HVAC, Electrical, or Plumbing work that results as a part of the overall Roof Replacement. -Building permits will be at no cost