Summary of Specifications:
DEMOLITION SPECIFICATIONS The City of Ferndale is seeking bids to remove the structures located at 2012 Moorhouse, Ferndale, MI 48220
GENERAL REQUIREMENTS OF CONTRACTOR • Maintain full insurance coverage from bid through final inspection. Submit Certificates of Insurance covering Worker’s Compensation, Comprehensive and Liability insurances, listing the City of Ferndale as the named insured, with the bid. • The Contractor will be responsible for any and all damages done to property or properties, which are not in the scope of the demolition. • Acquire demolition permit. A refundable $2500 bond is required. • Visual inspection for asbestos by independent third party per MIOSHA requirements. • Mobilize equipment, labor, materials, and tools necessary to complete demolition of structure and all accessory structures.
• Cap city sewer at property line. • Demolish/dismantle structure, discarding contents. • Remove standard footings to 42”, slabs and underground plumbing. • Remove and dispose of all debris off site in to a licensed landfill or recycling facility. Manifest may be requested by City. • Provide clean fill dirt and grade site to conform to adjacent lots. Property shall no drain onto adjacent property. • Leave property in neat and orderly manner.
GENERAL REQUIREMENTS OF CITY • Ferndale DPW to perform inspection of the sewer cap.
• Building Department to perform inspection (weekdays between 9 am and 4 pm) of the cleared site before backfill within 24 hours of request by Contractor. • The City will inspect all work after completion of the demolition and approve the job before completing paperwork and scheduling payment during normal bill paying schedules by the City. No bills will be paid for uncompleted or unsatisfactory work. • The City will not be liable for any accidents in the performance of the work performed by Contractor • Cut and cap water line. • Provide electric and gas shut-off letters. Include gas retirement fee in bid.
CONDITIONS • Cost to repair city sidewalks damaged by Contractor will be retained from $2500 bond. • There shall be no burial of materials on the demolition site by Contractor. • No burning of debris on site by Contractor.
EXCLUSIONS • Asbestos or hazardous material removal. • Tree removal. • Driveway removal within the public right-of-way. • Soil erosion fencing • Rodent control. • Grass seed or sod installation. • Outstanding water, sewer, tax bills.