Summary of Specifications:
MAJOR QUANTITIES INCLUDE: Furnish & Install 8” PVC C-900 Water Main 392.2 LFT Furnish & Install 8” Ductile Iron Cl. 52 Polywrapped Water Main 1,128.3 LFT Furnish & Install 8” Fusible PVC C-900 DR 14 Pipe Bursted Water Main 1,368.5 LFT Furnish & Install 12” Ductile Iron Cl. 52 Polywrapped Water Main 1,009.6 LFT (Total of all 3 geographic work locations, pay items delineated separately each location) The Engineer's Estimate is $1,063,117.10. A bid bond or certified check made payable to the City of Monroe in the amount of not less than five percent (5%) of the bid must be deposited by each bidder with his bid. This project consists of work in three (3) distinct geographic locations, and pay quantities are delineated separately for each. The City of Monroe reserves the right, but not necessarily the obligation, to award each location separately, or to award any combination of locations to any one lowest bidder in any combination in the sole best interest of the City. Bidders shall note that Prevailing Wage provisions apply to this contract, and are contained within Division J of the contract. See attached documents for additional information and instructions.