Summary of Specifications:
Sealed proposals for the construction of: SAINT MARY’S AVENUE STORM SEWER will be received by the City Clerk-Treasurer in the City Hall at 120 East First Street, Monroe, Michigan 48161, until 10:00 A.M., LOCAL TIME, Wednesday the 24th day of August, 20 16. The bids will be publicly opened and read aloud by the City Clerk at 10:00 A.M., LOCAL TIME, the same day, in the City Clerk-Treasurer's Office. MAJOR QUANTITIES INCLUDE: Furnish and Install 12” PVC SDR 35 Storm Sewer 275.0 LFT Furnish and Install 24” Diameter Storm Manhole 1.0 EA Furnish and Install 48” Diameter Storm Manhole 1.0 EA Furnish and Install 6” PVC SDR 35 Storm Sewer Lead – 15’ Max. 6.0 EA Furnish and Install 6” Concrete Pavement and Approach 56.1 SYD The Proposal and Contract Documents, including plans and specifications, may be obtained from the Michigan Intergovernmental Trade Network (MITN) at http://www.mitn.info. Bidders desiring a hard copy of these documents may obtain them from the Department of Engineering, 120 East First Street, Monroe, Michigan 48161 by making a deposit of FIFTY DOLLARS ($ 50.00 ) for each set of plans and specifications. IF PLANS ARE TO BE MAILED, ADD FIFTEEN DOLLARS ($15.00). No refunds will be issued for the return of any plans and specifications. The City of Monroe reserves the right to accept any proposal, to reject any proposal or to waive defects in proposals. A bid bond or certified check made payable to the City of Monroe in the amount of not less than five percent (5%) of the bid must be deposited by each bidder with his bid. Bidders shall note that Prevailing Wage provisions apply to this contract, and are contained within Division J of the contract. No bidder may withdraw his bid within SIXTY (60) days after the actual date of the opening thereof, but may withdraw it at any time prior to the scheduled closing time for receipt of bids. Engineer's estimate is $46,132.50 Please see attached documents for additional information and instructions.