The City of Taylor Central Purchasing Division is requesting a quick quote on behalf of Taylor Meadows Golf Club. The City of Taylor is accepting proposals from qualified contractors for painting amongst other interior work in the golf course’s banquet area as specified below.
Due Date and Submittal: Please submit directly through Bidnet or e-mail Quotes to dgrabowski@ci.taylor.mi.us by Monday, June 24, 2024 at 11:00am.
Work-Site Non-Mandatory Walkthrough: Wednesday, June 19, 2024 at 10:30am.
Project Location: Taylor Meadows Golf Club – 25360 Ecorse Rd, Taylor, MI 48180
Specifications
Taylor Meadows Banquet Room/Building’s East Side Walls
Banquet Room
Remove wallpaper
Remove mid-level wooden base and floor wooden base
Replace Floor base with a 6” Rubber Base color to be determined.
Skim coat (2 coats)
Prime (2 coats)
Paint - walls in entire room (2 coats)
Paint - drywall soffits (the lights will need to be taken out prior to painting)
Paint - any service panels
Paint - 7 door frames (both restrooms, storage closet, and all 4 kitchen doorways)
Paint - room divider panels
Repair - any damage, cracks, holes in walls
Replace - all wall plates, switch plates, outlet plates
Replace - storage room door stop on wall (left of women's restroom)
Replace all wall base
Northeast Hallway
Paint - window headers (2 coats)
Paint - double door header (2 coats)
Paint - ceiling beam near the patio double door (2 coats)
Greenside Grille Entrance Lobby
Skim coat - header above breakfast bar
Paint (2 coats) - header above breakfast bar
Paint - 5 door frames (2 storage closets, 2 restrooms, 1 double door frame)
REQUEST FOR QUOTE
City of Taylor
Budget & Finance Dept.
Purchasing Manager: DDG
23555 Goddard Road
Taylor, MI 48180
734-374-1459
Office Nook
Remove wallpaper
Skim coat (2 coats)
Prime
Paint - walls (2 coats)
Paint - 3 door frames
Repair - any damage, cracks, holes in walls
Replace - all wall plates, switch plates, outlet plates
Paint Types
Primer: B51W00620 - PrepRite® ProBlock® Interior/Exterior Latex Primer/Sealer
Finish: B20W12651 - ProMar® 200 Zero VOC Interior
Work to be completed the week of… (verify that one of these options works for your schedule)
July 22 - July 27
August 12- August 17
October 14 - November 1
NOTE: The above dates each offer a minimum of 6 consecutive days available to complete the work (without interruption) that do not have events currently scheduled in the banquet room. While the restaurant is open Mon-Fri at 2:00pm, we can do a work around using the patio and hallway if necessary. Restaurant will likely close mid-October until we open the simulators.
Requirements:
-Proof of Insurance
-100% Performance Bond