The contract will consist of the following principal items of work and appurtenances as specified
herein and shown on the contract drawings.
The approximate quantities for the major items of work for this project are as follows:
Sanitary Sewer, PVC Composite Truss, 12 inch, Tr Det B 339 Ft
Sanitary Sewer, PVC Composite Truss, 10 inch, Tr Det B 330 Ft
Sanitary Sewer, PVC Composite Truss, 8 inch, Tr Det B 1634 Ft
Sanitary Lead ABS, SDR 23.5, 6 inch 812 Ft
Station Grading 23.3 Sta
Subgrade Undercutting, Type 1 1400 Cyd
Sewer, Cl IV, 30 inch, Tr Det A 1358 Ft
Sewer, Cl IV, 30 inch, Tr Det B 277 Ft
Sewer, Cl IV, 24 inch, Tr Det A 257 Ft
Sewer, Cl IV, 24 inch, Tr Det B 84 Ft
Sewer, Cl IV, 18 inch, Tr Det B 38 Ft
Sewer, Cl IV, 12 inch, Tr Det B 354 Ft
Sewer, Cl IV, 12 inch, Tr Det B 118 Ft
Underdrain, Subgrade, 6 inch 4580 Ft
Aggregate Surface CSE, 17 inch 15732 Syd
Aggregate Surface CSE, 6 inch 603 Syd
HMA 13A, 1.5 inch 43 Ton
HMA 3C, 3 inch 86 Ton
Materials for this project must meet the “American Made” requirements of ARRA projects.