The contract requires the supply, and delivery of 6,000 tons of quarried stone to be loaded onto government owned barges on the Missouri River. The primary objective is to provide the government with a quoted price and the delivery location. Quarried stone must meet the requirements of the SOW for the operation and maintenance of approved structures of the Missouri River Recovery Program and Bank Stabilization Navigation Project through the remainder of the 2023 flow support season.
The period of performance for the total amount of the supply and deliver of quarried stone onto government barges is 45 days. The contractor shall be prepared to start individual deliveries onto government barges with a notice of three (3) days and shall maintain the capability to deliver and load up to 1,000 tons of stone per week on an intermittent and as-needed basis.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via SAM.gov (sam.gov).
Find solicitation announcement in SAM.gov (sam.gov).
- Use the ‘All Award Data' to locate the project (by entering the solicitation number.
- By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
- Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Link.