Specifications include, but are not limited to: 5.1 The Vendor is responsible for obtaining and paying of all fees and charges associated with permits or licenses required to complete the work for this project. This shall include any necessary ROW, street use, sidewalk closure, parking closures, or street closure permits and/or fees required for the Vendor to complete its work. No more than one (1) block face shall be closed simultaneously at any given time. 5.2 Vendors will comply with local parking and neighborhood requirements to determine where to park vehicles and stage equipment during the term of the project. 5.3 Vendor will be responsible for supplying and maintaining portable restroom facilities as required for workers during the construction project. 5.4 Vendor takes full responsibility for all of their employees and any subcontractors who are hired to work on the project. 5.5 All work related to the construction shall be included in the lump sum amount for the bid. 5.6 Vendor will be responsible for protecting existing sidewalks, curbs and existing utilities and all adjacent facilities that are not specified for removal. 5.6.1 Vendor will be held responsible for any damage or lost items during this process. 5.7 Vendor is required to ensure all work is performed in accordance with the contract documents and to immediately notify the designer and project manager of any perceived discrepancies or errors in the contract documents. 5.8 Vendor shall coordinate all site activities in such a matter to limit the impact to events in the area, including but not limited to events at Pinnacle Bank Arena, the Farmer’s Market, events at the Railyard, and other events in the area. 5.8.1 The current known Pinnacle Bank Arena event schedule is provided as an attachment to the bid documents for reference.