Specifications include, but are not limited to: The contractor selected for this work will be responsible for manufacturing, supplying and delivering winter sand to the Sunapee Highway Department beginning on or about October 4, 2021 and continuing through on or about April 15, 2022 with the following conditions: 1. The successful bidder will deliver approximately 4,000 tons +/- of screened bankrun sand or a manufactured crushed ledge/sand product to the Sunapee Highway Department during the above listed time period. 2. The winter sand gradation requirements for screened bankrun sand or a crushed manufactured sand shall meet the following material gradation and be tested by an accredited material testing laboratory: Sieve Size Percent Passing 3/8β 100 ΒΌβ 90-100 #10 55-95 #40 10-60 #200 0-7.5 (Percent passing #200 may be increased with prior approval from Highway Director) 3. Contractors shall provide the cost per ton for winter sand delivered to the Highway Department. 4. Contractors may at their option provide a per cubic yard price for winter sand. However, the actual weight of the winter sand shall be verified by an accredited materials testing laboratory and provided with the Bid Proposal for conversion to cost per ton.