Specifications include, but are not limited to: Sand Ton 15,519 $ $ Sand (Washed/Screened) Ton 16,721 $ $ Concrete Sand (Washed) Ton 16 $ $ Manufactured Sand (Washed) Ton 844 $ $ Winter Sand (Washed) Ton 1,554 $ $ Gravel Ton 12,748 $ $ 4" Gravel Ton 491 $ $ 3/4" Crushed Gravel Ton 1,775 $ $ 3/4" Stapak (Crushed Gravel) Ton 2,279 $ $ 1" Crushed Gravel Ton 11,178 $ $ 1-1/2" Crushed Gravel Ton 4,163 $ $ 3" Crushed Gravel Ton 87 $ $ 5" Minus Crushed Gravel Ton 30 $ $ 3/4" Crushed Bank Run Gravel Ton 1,427 $ $ 1 1/2" Crushed Bank Run Gravel Ton 435 $ $ 6" Bank Run Gravel Ton 148 $ $ 6" Quarry Run Gravel Ton 564 $ $ Stone Dust Ton 4,372 $ $ Crushed Stone Ton 14,320 $ $ Dense Crushed Stone Ton 29,692 $ $ 3/8" Blend Crushed Stone Ton 68 $ $ 3/4" Crushed Stone Ton 12,475 $ $ 1" Crushed Stone Ton 5,180 $ $ 1 1/2 Crushed Stone Ton 4,868 $ $ 7" Crushed Stone Ton 1,359 $ $ 3/8" Stone Ton 16 $ $ 3/4" Stone Ton 832 $ $ 1 1/2" Stone Ton 363 $ $ 3-6" Quarry Stone Ton 237 $ $ 3" Stone Ton 189 $ $ 6+" Stone Ton 1,833 $ $ 7" Crushed Stone Ton 148 $ $ Product - Other Blasted Ledge Ton 428 $ $ 3/8" Ledge Pack Ton 443 $ $ 3/4" Ledge Pack Ton 28 $ $ HardPak Ton 591 $ $ Clean Fill Ton 17,560 $ $ Screened Top Soil Ton 142 $ $ Loam Ton 336 $ $ Mulch Ton 41 $ $ Tailings Ton 160 $ $ Recycled Concrete Ton 74 $ $ Recycled Asphalt Ton 74 $ $ Slag Ton 74 $ $ Single Pass Ton 18 $ $ Truck Overtime Usage Hours Hours 820 $ $