SCOPE OF WORK
THE BASE BID SCOPE OF WORK SHALL CONSIST OF:
A. THE WORK COVERED BY THE DRAWINGS & SPECIFICATIONS SHALL INCLUDE THE FURNISHING OF ALL MATERIALS, LABOR, EQUIPMENT, TOOLS, TAXES, TRANSPORTATION, UTILITIES AND INCIDENTALS NECESSARY FOR THE COMPLETE EXECUTION OF ALL WORK INDICATED & SPECIFIED IN THE DOCUMENTS.
B. PROJECT REQUIREMENTS - IT IS THE INTENT OF THE CONTRACT DOCUMENTS TO PROVIDE AN INSTALLATION COMPLETE IN EVERY RESPECT. IN THE EVENT THAT ADDITIONAL DETAILS OR SPECIAL CONSTRUCTION IS REQUIRED FOR WORK INDICATED OR SPECIFIED, IT SHALL BE THE RESPONSIBILITY OF THAT CONTRACTOR TO PROVIDE ALL MATERIAL & EQUIPMENT WHICH IS USUALLY FURNISHED WITH SUCH SYSTEMS IN ORDER TO COMPLETE THE INSTALLATION, WHETHER MENTIONED OR NOT.
C. GENERAL PROJECT DESCRIPTION SCOPE OF WORK INCLUDES, BUT NOT LIMITED TO, THE FOLLOWING:
1. THE COMPLETE REMOVAL OF ALL EXISTING FIRE PROOFING ON STRUCTURAL MEMBERS IN WORK AREA.
2. THE PREPARATION OF SURFACES PER MANUFACTURE INSTRUCTIONS AND THE INSTALLING OF NEW FIRE PROOFING SYSTEM ON EXISTING STRUCTURAL MEMBERS THROUGHOUT WORK AREA.