The Base Bid Scope of Work shall consist of: A. THE WORK COVERED BY THE DRAWINGS & SPECIFICATIONS SHALL INCLUDE THE FURNISHING OF ALL MATERIALS, LABOR, EQUIPMENT, TOOLS, TAXES, TRANSPORTATION, UTILITIES AND INCIDENTALS NECESSARY FOR THE COMPLETE EXECUTION OF ALL WORK INDICATED & SPECIFIED IN THE DOCUMENTS. B. PROJECT REQUIREMENTS - IT IS THE INTENT OF THE CONTRACT DOCUMENTS TO PROVIDE AN INSTALLATION COMPLETE IN EVERY RESPECT. IN THE EVENT THAT ADDITIONAL DETAILS OR SPECIAL CONSTRUCTION IS REQUIRED FOR WORK INDICATED OR SPECIFIED, IT SHALL BE THE RESPONSIBILITY OF THAT CONTRACTOR TO PROVIDE ALL MATERIAL & EQUIPMENT WHICH IS USUALLY FURNISHED WITH SUCH SYSTEMS IN ORDER TO COMPLETE THE INSTALLATION, WHETHER MENTIONED OR NOT. C. GENERAL PROJECT DESCRIPTION SCOPE OF WORK INCLUDES, BUT NOT LIMITED TO, THE FOLLOWING: 1. REMOVAL AND REPLACEMENT OF EXISTING ROOFING ASSOCIATED FLASHING. 2. REMOVAL AND REPAIRING/PATCHING OF UNUSED VENT. 3. INSTALLATION OF NEW 1/2" ISOGARD HD COVER BOARD OVER PREPPED EXISTING ROOFING SYSTEM. 4. INSTALLATION OF NEW EPDM 060 FULLY ADHERED OVER THE COVER BOARD TO PROVIDE 20 YEAR WARRANTY. 5. NEW FLASHING PER DETAILS 6. INSTALLATION OF NEW 7”x 7” GUTTER SYSTEM WITH 4”x 3” DOWNSPOUT AND CAST ALUM. LEADER BOOT.