Summary of Specifications:
Scope of Work shall is described in the drawings and specifications. Briefly, the following work is included in the Project: 1. Remove and repair exterior marble wall panels. 2. Remove and repair the entry stairs and stone pavers. 3. Add a handicap ramp to the main entry. 4. Replace Lobby and Mezzanine glazing. 5. Modify existing storefront framing. 6. Replace Lobby, Auditorium, Dressing Room and Stagecraft exit doors. 7. Add a Lobby/Mezzanine elevator, with mechanical room. 8. Renovate the Check Room, to secure the Light/Sound Control Booth. 9. Renovate Mezzanine toilets to be ADA compliant. 10. Add piano storage in the Dressing Room, access from the Stage. 11. Paint stage walls. 12. Refinish stage floor. 13. Renovate stage floor box positions. 14. Renovate stage lights. 15. Add sound system monitor speakers. 16. Replace projection screen. 17. Add AV projector. 18. Add sound deadening material to stage ductwork. 19. Add fire shutter doors to the Dressing Room alcove and Piano storage. 20. Renovate the Dressing Rooms. 21. Renovate all terrazzo stairs to be ADA compliant. 22. Install Fire Alarm devices in the Janitor and Boiler Rooms. 23. Paint interior finishes. Construction Notice to Proceed is scheduled for April 29, 2005. Substantial Completion will be achieved by August 12, 2005.