These specifications are based upon design and performance criteria which have been developed by the City of Farmington as a result of extensive research and careful analysis of the data. Subsequently, these specifications reflect the only type of equipment, material(s) or supplies that is/are acceptable at this time. Therefore, exceptions may be accepted if they are minor, equal, or superior to that which is specified, and provided that they are listed and fully explained on a separate page entitled, "Exceptions to Specifications". The exceptions shall refer to the Bid #25-160529, Three Phase Padmount Transformers 12 specification page and paragraph number. The Purchaser shall determine which (if any) exceptions are acceptable and this determination shall be final. B. Minimum Requirements 1. Equipment other than current year models will not be considered as responsive to the Specifications. It is the intention of the City to purchase based on the Specifications, a standard production model. 2. The unit shall be completely assembled, lubricated, adjusted, with all equipment including standard and extra equipment installed and the unit made ready for operation. 3. In addition to the equipment set out in the Specifications, the units shall include all equipment set out in the manufacturer's literature as standard equipment. They shall include all exterior moldings, name plates, medallions, series identifications, and chrome of every description that is usual for standard stock models of this series.