The General Trades Contractor shall be responsible for all work shown on Architectural (A) Drawings unless noted otherwise and any site work shown on all other drawings and further defined below:
1. Provide the complete work of Division 02 - Existing Conditions unless noted otherwise. 2. Provide the complete work of Division 07 - Thermal and Moisture Protection, with the following exceptions:.
a. Install all curbs and rails for rooftop mechanical equipment, as furnished by the Mechanical Contractor. 3. Provide the complete work of Division 09 - Finishes, unless noted otherwise.
a. Specification Section 09 84 30 - Sound-Absorbing Wall and Ceiling Units 4. Provide the complete work of Division 14 - Conveying Equipment with the following exceptions:
a. Power and final connections to all electrically operated conveying equipment to be provided by Electrical Contractor.
The Mechanical Contractor shall be responsible for all work shown on the Mechanical (H) and Plumbing (P) Drawings and any mechanical work shown on all other drawings and specifications and further defined below: 1. Division 22 - Plumbing: a. Specification Section 22 10 05 - Plumbing Piping and Specialties 2. Provide the complete work of Division 23 - Heating, Ventilating and Air-Conditioning (HVAC), with the following exceptions:. a. Furnish all curbs and rails for rooftop mechanical equipment and turn over to the General Trades Contractor for installation.
The Electrical Contractor shall be responsible for all work shown on Electrical (E) and Technology (T) Drawings unless noted otherwise, and any electrical work shown on all other drawings and further defined below: 1. Division 14 - Conveying Equipment: a. Specification Section 14 20 00 - Elevators 1) Provide power and final connections 2. Division 22 - Plumbing: a. Specification Section 22 30 00 - Plumbing Equipment including but not limited to: 1) Provide power and electrical connections to Plumbing equipment. 3. Division 23 - Heating, Ventilating and Air-Conditioning (HVAC): a. Specification Section 23 81 26.13 - Small Capacity Split-Systems Air Conditioners 1) Provide electrical connections to all equipment, per manufacturers’ requirements, necessary for equipment to operate as intended. 4. Provide complete the work of Division 26 - Electrical 5. Provide the complete work of Division 27 - Communications