The work location is the raw water intake gatehouse within Washington Lake accessible via an
approximately 275 foot gravel access road atop an earthen causeway and an approximately fifty (50)
foot gangway between the causeway and gatehouse. Washington Lake is accessible from Little Britain
Road/NYS Route 207 in the Town of New Windsor. The general scope of work consists of protection of
Washington Lake during work, demolition and reconstruction of the roof structure, replacement of
windows and doors, internal finishing, and electrical work. All work is subject to prevailing wage
rates and requires submission of original certified payrolls as a condition for payment.
A Mandatory Pre-Bid Meeting has been set for Wednesday, February 20, 2019 at 10:00 a.m. at the work site. Attendance is required in order for a bid to be considered.
The work includes providing all labor, materials, machinery, tools, equipment and other means of
construction necessary and incidental to the completion of the work shown on the plans and
described in these specifications including, but not necessarily limited to the following: demolish
the existing roof, including but not limited to shingles, plywood and shiplap roof deck, rafters,
collar ties, double top plate, windows, doors, lifting beams and paint. Prepare structure as
required to construct new roof structure, roof deck, vented soffits and eaves, new standing seam
roof and fascia to form a weather resistant roof system, windows, doors, power gantry crane hoist
system with structural support frame, interior and exterior light fixtures, conduit, raceways and
conductors, breakers and miscellaneous fasteners, pointing of interior walls, wall and floor
preparation, paint interior walls and floors, complete.