B22058
Rehabilitation of CR25 & Culvert Replacements on CR8
Location: Town of Phelps CR25 STA. 71+95 to 176+39, and Town of Farmington CR8 NY96 to Wayne Cty line
Prebid: None
Opening: Wednesday, March 1, 2023
Price: $100 hard copy
$50 electronic
Set Includes:
One Book
One set of drawings
Documents are available electronically to planholders
Project Scope
Work under this contract will include County Road 25 Rehabilitation in the Town of Phelps and
replacement of cross culverts on County Road 8 in the Town of Farmington. The work on County Road
25 will consists of replacement of cross culverts, installation of road underdrain system, grading and
shaping of roadside ditch section, driveway culverts, heater scarification, milling of bituminous pavement,
asphalt paving, guide rail installation and turf establishment. The work on County Road 8 will include
the replacement of the following cross culverts, culverts 21, 24, 26, 29, 31, 34, 35 and 37 and other
incidental work as shown on the contract drawings.
The Contractor’s attention is called to the close proximity of utilities at the project site.
Culvert #8 on County 25 will be replaced during this project and will require a three (3)
week closure of County Road (CR) 25 to ensure the safety of the travelling public and
construction crews. At all other times, the road will remain open to through traffic (1-lane minimum) during
the construction.
Road closure shall not commence before June 26, 2023 and shall end on or
before September 1, 2023.
Contractor will be allowed to close CR 08 for a maximum of two (2) weeks to install
culvert #21 per the Contract Documents. At all other times, the road will remain open to through traffic (1-lane minimum) during
the construction.
Road closure shall not commence before July 4, 2023 and shall end on or before
September 1, 2023.