Project #1 – ROOF & CHIMNEY; 1. Remove all existing roof coverings, including Porches and Additions, down to the decking and remove from site. For venting purposes, on upper roof areas cut out and remove 2 inches of existing decking the length of each ridge. 2. Install 30# asphalt saturated felt over the entire area (except where snow and ice shield to be installed), leaving a 2-inch opening the length of the ridge on upper roof areas. Install 2-inch white aluminum drip edge at all eaves and rake edges. 3. Install to manufacturer’s specifications, waterproofing underlayment such as “CertainTeed” Winter Guard, or equal, to all eaves. Underlayment is to run up roof no less than 6 feet on all areas equal to or greater than 3:12 slope. All areas less than 3:12 underlayment shall cover entire area.