Specifications include, but are not limited to: In furtherance of the Battery Park City Artwork Logistics Project (the “Project”), BPCA hereby requests proposals from experienced artwork logistics, relocation and installation contractors (individually, a “Proposer,” and collectively, the “Proposers”) to provide the services necessary to protect and preserve certain specified public artwork pieces throughout Battery Park City (individually, an “Artwork” and collectively, the “Artworks”) during construction of two (2) specified BPCA-led coastal resiliency projects, as detailed in this Request for Proposals’ Scope of Work (the “Work”). For each task listed below, the selected Contractor will first assess and document the condition of the Artwork(s), and then prepare a detailed approach plan and schedule for BPCA’s review. Upon receipt of BPCA’s approval, the selected Contractor will proceed with implementation of the following tasks (which vary based on the particular Artwork(s)): protect in place certain Artworks at their existing locations; remove, repair/restore (if/as necessary), store, and re-install certain Artworks; and, remove protect-in-place materials installations for certain Artworks, and prepare/provide a Construction and Demolition Waste Management Plan to reduce the amount of waste sent to landfill.