Specifications include, but are not limited to: I. Inspections/Servicing of Equipment – General PM A. Examine each piece of equipment and device to see that it is functioning properly and is in good operational condition. B. Complete cleaning of units and removal of dirt, debris, droppings, etc. in and around units. C. Clean all components of dust, old lubricants, etc. to allow the equipment to function as designed. D. Securing of loose conduits. E. Reattachment of missing sheet metal covers on units. F. Replacement of electrical conduit box and motor box covers and lids. G. Reattaching all ground wiring. H. Lubricate all equipment where needed to permit bearings, gears, and all contact wearing points to operate freely and without undue wear. I. Start/run systems and equipment. Check overall performance. J. Adjust all linkage, motors, drives, etc. that have drifted from the initial design settings and positions. K. Calibrate all sensing, monitoring, output, safety, and read-out devices for proper ranges, settings, and optimum efficiencies. L. Check output temperatures making any adjustments necessary to maintain appropriately balanced systems. Check internal pressures if performance deficiencies are detected...