Specifications include, but are not limited to: providing all labor, material, and equipment necessary to install new water lines and appurtenances in the upper park potable water system as shown and specified in the contract documents; Furnishing and installation of all associated piping, exterior drinking fountains, pedestal hydrants, valves, and seasonal drains; Installation of an empty conduit parallel to the watermain on the park service road for future communications lines; Removal of existing water spigots, pits, and other previously existing site water appurtenances to below grade; Providing all trenching, backfill, and restoration associated with work of this contract. Additionally: Waterline crossing of Enfield Creek shall be done by horizontal directional drilling; Connection of building services will be 5' outside the buildings; The largest watermain size is 4". Coordinate all work with NYS OPRHP Staff.