The existing Berth 10 & 12 is a public berth of approximately 1,050 linear feet located on the South peninsula at Port Newark, typically used to unload heavy dry bulk products, and has been out of service since 2021. The Project would restore Berth 10 & 12 to full operation and with a new wharf structure built to current design standards, including an increased loading capacity, a 75-year design life, and additional capacity for future resiliency investments. The Project provides for (i) demolition of the existing out-of-service berth, including the existing concrete deck, timber piles and bulkhead wall (these components together comprise the wharf structure); and (ii) construction of a new Berth 10 & 12 wharf structure in the same footprint, including a steel pipe-pile supported highlevel wharf platform and steel bulkheads, built to meet PANYNJ climate resiliency guidelines and current design standards and codes.