The work consists of replacing an existing ceiling, lighting and HVAC vents in the 1979 addition of the Warner Library. The project includes the book sale room, Young Adult area, reference office and public computer area, including an area directly over the staircase. The ceiling, HVAC vents and lighting fixtures to be installed must be to the specifications provided in the schedules attached to this RFP.
The selected contractor shall be responsible for supplying all necessary manpower, equipment, tools, materials, and incidentals required to perform the following tasks:
- Install and maintain all necessary protection to insure no damage to existing finishes to remain in and adjacent to the construction site. Remove existing concealed spline ceiling, light fixtures and HVAC vents in book sale room, young adult area, reference offices and public computer area.
- Install acoustical tile ceiling specified in Attachment 1
- Reinstall HVAC vents in same positions as removed. Properly balance HVAC system once completed.
- Install light fixtures as specified in the Lighting Fixtures Schedule in Attachment 1.
- Temporarily remove and reinstall smoke detectors, camera and existing emergency exit signage.
- Square footage of the project is to be determined by contractor. Please make arrangements to measure by calling Warner Library at 914-631-7734.
- Remove all garbage and debris. Keep job site broom clean and tidy at end of each workday.
- Apply for a building permit with the Village of Tarrytown. Fees are waived for Warner Library as a Department of the Village of Tarrytown.
- Clean all impacted areas prior to completion of work