Demolish and remove from site all buildings and structures, to include (if found to be present) well and/or pump houses, walls, foundations, footings, basements, roofing materials, doors, windows, steps, slabs, walkways, HVAC systems, swimming pools, storage buildings, metal, wood, paper, glass, bottles, cans, garbage, and other debris present on this site. If present, lawfully remove and/or fill and abandon private well(s) and septic tank(s). Clean, grade, seed, straw lot. • There is one primary building to be removed from this site: (1) single-family residential home with porches (approximately 1,000 sf includes porches). • If present, do NOT remove the CONX. • Remove underground and overhead wiring not connected to electrical service, and other items associated with the primary structure. • Remove all building and construction materials. • Remove all poles, post, rubbish, trash, debris, tall weeds, tall grass, undergrowth, vines, downed trees, dead trees (standing or fallen), fallen limbs, logs, and organic debris piles from lot. • Remove concrete parking pad and patio. • Do NOT damage public sidewalks or utility assets. • Level and grade mound of sand located left of house. • Several indentions (approximately four holes/low areas) are present in the ground at the site. Fill and grade these areas to be same level as existing surrounding soil. • Add fill and topsoil as needed to raise excavated areas to the same grade level as the existing surrounding soil. • When finished grading, surface of site shall be smooth and allow for natural drainage. NO dips, ridges, or low areas shall be present where ponding water may accumulate. NO clumps of soil, grass, or other debris shall remain. • Apply seed and straw to all areas of site where soil was disturbed, fill was added, or where bare soil is present. Loosen areas to be seeded to a depth of at least 2”. Apply seed and straw of the following types and rates: Contractors Blend Grass Seed Mix – 1/2# / 100 SF; Wheat Straw – 1/2 Bale / 100 SF. • Contractor shall obtain, at their expense, ALL Required Permits, Licenses, Bonds, Insurance, Reports, Designs, Engineering, Inspections, and Certifications. • Contractoris responsible for complying with ALL Local, City, County, State, and Federal, Codes, Laws, Legislation, Ordinances, Regulations, and Rules. • All work must be completed within 30 calendar days from the time the Notice to Proceed (Purchase Order) has been issued unless otherwise stated. • Contractor is responsible for providing at least 24-hours advance notice to the Economic & Community Development Department before work begins by calling and/or emailing the Senior Housing Program Specialist. Do not begin work until a response from ECD has been provided. • Contractor shall provide their invoice, landfill weigh tickets, asbestos disposal records if applicable, and other associated receipts and/or records for this project to the Senior Housing Program Specialist. • The project site shall be inspected by the Senior Housing Program Specialist in order to verify that all requirements contained in the Scope of Work have been satisfactorily completed before payment is processed.