• The Contractor shall conduct a detailed assessment of the existing electrical system in the attic of the entire Main House. This assessment shall include identification of all areas within the project location that do not meet current electrical code and standards. This assessment will be held by scheduling a site visit with the Carteret County point of contract (POC) listed below. • All non-compliant materials shall be replaced, repaired or protected with new code approved materials, that shall be properly fastened. This shall include but is not limited to, adding and/or replacing outdated, abandoned or non- compliant low and high voltage wiring, protection of existing wiring using code compliant conduit(s), electrical panels, junction boxes, fittings, switches, breakers, fuses, receptacles and any drops fed from the ceiling. • The Contractor shall be responsible for uninstalling and reinstalling any ceiling fixtures in order to access areas above. • The Contractor shall develop and submit a detailed plan for upgrading the electrical system to meet or exceed current codes and standards, post award. • The Contractor shall provide detailed documentation of all work performed including materials used and changes made upon completion.