Specifications include, but are not limited to: Painting all Cell Block Day areas (2 coats) including but not limited to walls, rails, doors, fencing and air duct supply and return grills. Epoxy concrete floors in the Day Rooms with three base coats. Extensive prep work needed. Quote to include all material and equipment needed to complete project. • All work shall be scheduled and coordinated with the on-site staff. Some of the work may require coordination with inmate relocation activities. Clean up each area prior to moving to another area. • While in the building the contractor and his employees will be escorted by Detention Center employees. • Thoroughly clean all walls, remove mildew/mold and treat with antimicrobial solutions as recommended by the wall coating manufacturer. • Prepare the walls and floors for the coating system as recommended by the coating manufacturer and required by warranties associated with the coating supplied. The surface shall be free from dirt, dust, grease, oil, paint, or any other contaminates. • Apply the coating system specified, in the coverage rates listed by the manufacturer and in the recommended application sequences and curing times. • Provide manufacturers’ standard warranty for product and application. • Plans of the Detention Center are restricted and will not be distributed. • Attendance at the Pre-Bid meeting is not mandatory, but it is highly encouraged. • The are four cell blocks. All square footage measurements are approximate. The contractor is responsible for the complete painting scope of each area on a lump sum basis. Each block has approximately: o Wall square footage 3800 (Painting). The walls are approximately 20 to 25 feet high. o Floor square footage of 2150 (Epoxy) o 48 - 10x8 HVAC grills (2 in each cell) o 1 – 14x10 HVAC vent grill in shower o 2 - 24x24 HVAC vent grills in the ceiling duct work and the entire ceiling duct work is to be painted. o 1- 14x20 HVAC vent grill on the second floor. o All Cells doors (front and back) and the entire door frame shall be painted. • The ceiling duct work is to be painted in the day room and the ceiling exhaust and security bars are to be painted. • There are approximately 5 metal tables in each block. These are attached to the floor and need to remain. The legs and the platform will need to be painted the same color as the walls. • Re-Stencil cell numbers to match the original number and any other lettering. • The painting and epoxy will be coordinated simultaneously with a re-locking project of the cell doors in the facility. The re-locking will be performed by another contractor.